Coal Stock Measurement, Site Surveying and Track Alignment Planning for Lalitpur Power Generation Plant

Project Description

Coal Stock Volumetric Survey, Site Survey & Track Alignment Survey
Lalitpur Power Generation Plant, Uttar Pradesh

Neelmurti Consultant & Associate carried out professional survey and mapping work at Lalitpur Power Generation Plant, commonly known as Bajaj Power Plant. The work included coal stock volumetric survey, topographical site survey, track alignment survey, control point establishment, data collection, and technical mapping using advanced survey instruments.

The survey was executed using Total Station, DGPS and Drone technology to achieve accurate measurements, reliable site data and proper alignment information for industrial planning and operational requirements. The work covered coal stock measurement, railway/track alignment checking, site-level data collection, plant area mapping, and preparation of survey outputs for engineering and management use.

Scope of Work

Coal Stock Volumetric Survey
Topographical Site Survey
Track Alignment Survey
DGPS Control Point Establishment
Total Station Data Collection
Drone Aerial Survey and Mapping
Contour and Level Survey
Industrial Site Mapping
Survey Data Processing and Reporting
CAD Drawing and Technical Documentation

Technology Used

Total Station
DGPS
Drone Survey
AutoCAD
Civil 3D
Digital Survey Processing Tools

Key Deliverables

Coal Stock Volume Report
Topographical Survey Drawing
Track Alignment Drawing
Contour Map
Site Layout Data
Coordinate and Level Data
Drone Orthomosaic / Aerial Output
Digital CAD Drawing
Survey Report and Documentation

Project Objective

The main objective of this survey work was to provide accurate and reliable data for coal stock assessment, site planning, operational monitoring, track alignment verification and infrastructure management. The survey helped in better decision-making, quantity assessment, alignment planning and technical documentation for the power plant site.

Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image
Project Image